Power-First Compute Site with Dark & Lit Fibre Options - 1.2 MW of usable demand available now on the existing 1,500 kVA service, with a BC Hydro written estimate for 7.5 MW via Gibsons substation (25 kV), below the 10 MW trigger for BC's competitive AI/data centre power allocation. Plus pending BC Hydro study on a direct tap to the 138 kV & 230 kV transmission lines adjacent to the site. FIBRE: written proposal for a 20-yr dark fibre IRU (12 strands) on a new dual-route subsea ring landing on site and in downtown Vancouver, plus two carriers that can provide 100 Gbps lit service (400 Gbps scalable) over diverse paths. 3.18 acre heavy industrial I11 site, 90 mins from Vancouver, ~67,000 sqft max build coverage. Existing 12,400 sqft facility (2024) on 200 PSF live-load slab, 25 GPM dual-pump private well, 120 kVA house-load genset, 5,000 gal leased propane tank (~24 hr fuel for 1.2 MW of added gensets; refill depot 450m away), Bosch security. Computing use subject to SCRD approval. (id:59126)